Public projects carry tender specifications, documentation requirements and audit expectations that matter as much as the hardware — a system that works but cannot be evidenced is a problem.
What a system here usually includes
Specification-compliant equipment selection
Command and control room build
ANPR at public entry points and roads
Long retention with tamper-evident storage
Documentation and handover as per tender conditions